As a process line for gravel aggregate, the gravel production line consists of many inevitable machines, such as the jaw crusher, impact crusher, hammer crusher, sand making machine, belt conveyor, and so on.
The design plays a very important role in the whole gravel production line, which should be designed according to the terrain of the construction site. Here, Hongxing will talk about how the gravel production line is designed by the terrain with you.
Before the installation of the gravel production line, the designer should firstly inspect the terrain on site and design the production line on the basis of the rugged terrain. Then, in this production line, each machine must have the firm foundation, installed according to the design drawing, for fastening the equipment and preventing the vibration, which can prolong the service life of the ore processing equipment.
According to the most basic principle of the installation of the gravel production line, the primary crushing machines should be installed on the relatively higher land while the secondary crushing ones on the lower land due to the different positions of the inlets and the outlets of the machines. In general, the terrains are divided into hilly area and plain.
Email: sell@hxjq.com
Address: High and New Industrial Zone, Kexue Revenue, High and New Technology Industrial Development Zone, Zhengzhou, China